HOME / ¹®¼­°øÀ¯ / /

Èıâ1°Ç
¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) - ½æ³×ÀÏ 1page
1/9
  • 1 page
  • 2 page
  • 3 page
  • 4 page
  • 5 page
  • 6 page
  • 7 page
  • 8 page
  • 9 page

¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure)

¼­½Ä¹øÈ£
TZ-SHR-961470
µî·ÏÀÏÀÚ
2018.12.11
ºÐ·®
9 page / 62.0 KB
Æ÷ÀÎÆ®
3,000 Point ¹®¼­°øÀ¯ Æ÷ÀÎÆ® Àû¸³¹æ¹ý ¾È³»
ÆÄÀÏ Æ÷¸Ë
Microsoft Word (doc)
Èıâ Æò°¡

5.0

1°ÇÀÇ Èı⺸±â

µî·ÏÀÚ

hw****** ºê·ÐÁî

µî±Þº° ÇýÅú¸±â

¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure)¿¡ ´ëÇØ ±â¼úÇÑ Âü°íÀÚ·áÀÔ´Ï´Ù.

  • Microsoft Word (doc)Microsoft Word (doc)
°Ë»ç°Ë»çÀýÂ÷inspectionprocedurePiping¹è°üÀýÂ÷
¿¬°ü ÃßõÀÚ·á
 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #1 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #2 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #3
 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #4 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #5 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #6
 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #7 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #8 ¹è°ü °Ë»çÀýÂ÷¼­(Piping inspection procedure) #9

1Àå PURPOSE

2Àå SCOPE

3Àå REFERENCE DOCUMENTS
1. Applicable codes and specifications
2. Applicable codes and standards

4Àå DOCUMENTS TO BE RECEIVED/AVAILABLE AT INSPECTION


5Àå INSPECTION STAGE
1. Material Receiving Inspection
2. Shop Fabrication Inspection
3. Erection Line Inspection(after pipe spools installation)
4. Flushing Inspection
5. Hydrostatic or Pneumatic Test Inspection
6. Reinstatement Inspection
7. Pre-commissioning Inspection


6Àå INSPECTION PROCESS
1. Material Receiving Inspection
2. Shop Fabrication
3. Field Installation Inspection

7Àå ACCEPTANCE CRITERIA

piping inspection procedure  for offshore project  revision no.: 1  date :   pages : 9  contents   page  purpose : 2  scope : 2  reference documents : 2  
documents to be received/available at inspection : 3
inspection stage : 3  inspection process : 4  acceptance criteria : 9  page 1 of 9  purpose  
the purpose of this piping inspection procedure is to describe the inspection activities involved in the in process of an offshore project during shop fabrication and installation.
scope  
this piping inspection procedure covers all necessary stages from procurement, material receipt, and storage, shop fabrication, installation of the pipe spools at the module site.also in process testing, inspection procedures and pre-commissioning are dealt with.
the methodology complied in this piping inspection procedure is to systematically progress through the entire piping construction phase.

experienced, inspectors may interpret the intent of the procedure to accommodate local or novel practices or to utilize the procedure for a one-off or alternative design of a piping spool. the alternative designs may be documented as site instruction, field engineering changes and shall be approved by the client

any such variations should be noted on the inspectors report.
this procedure is intended to act as a guide to the inspector in the course of the inspection programme.all tests and inspections shall be carried out to the approved engineering drawings, project specifications, project or company standards, and within the practices and rules of the country, state or province and any government legislation, decrees, laws, ordinance or regulation which may apply.
if any conflict or contradictions should be apparent in any of the above then the more onerous requirement will apply unless the client directs otherwise in writing.
reference documents  applicable codes and specifications  project specification  project standard  approved isometric drawing  approved p & id  applicable codes and standards  
asme b31.1 : power piping
asme b31.3 : process piping
asme b31.4 : pipeline transportation systems for liquid hydrocarbons and other liquids
asme b31.8 : gas transmission and distribution systems
ansi/aws d1.1: structural welding code
api rp 14e : design and installation of offshore production platform piping systems
api std 1104 : welding of pipeline and related facilities
asme i, asme boiler and pressure vessel code: section i, rules for construction of power boiler
asme ii, part c: specifications for welding rods, electrodes and filler metals
asme viii, asme boiler and pressure vessel code : section viii, rules for construction of power boiler
page : 2 of 9  
asme ix, asme boiler and pressure vessel code : section ix, welding and brazing qualification
asme v, asme boiler and pressure vessel code : section v, nondestructive examination
nace mr-0175, sulfied stress cracking resistant : metallic materials for oil field equipment
asme b16.1 : forged fittings, socket-welding and threaded
asme b16.5 : pipe flangeds and flangeds fittings   (ÀÌÇÏ »ý·«)

¹ÞÀº º°Á¡

5.0/5

1°³ÀÇ º°Á¡

¹®¼­°øÀ¯ ÀڷḦ µî·ÏÇØ ÁÖ¼¼¿ä.
¹®¼­°øÀ¯ Æ÷ÀÎÆ®¿Í Çö±ÝÀ» µå¸³´Ï´Ù.

Æ÷ÀÎÆ® : ÀÚ·á 1°Ç´ç ÃÖ´ë 5,000P Áö±Þ

Çö±Ý : ÀÚ·á 1°Ç´ç ÃÖ´ë 2,000¿ø Áö±Þ

ÈıâÀÛ¼º»ç¿ëÈı⸦ ÀÛ¼ºÇÏ½Ã¸é ¹®¼­°øÀ¯ 100 point¸¦ Àû¸³ÇØ µå¸³´Ï´Ù.

¼­½Äº°Á¡ ¡Ù¡Ù¡Ù¡Ù¡Ù

0/120

»ç¿ëÈıâ (1)

  • 2023-07-1216********

    ¾÷¹«¿¡ ¸¹Àº µµ¿òÀÌ µÇ¾ú½À´Ï´Ù. °¨»çÇÕ´Ï´Ù

ÀÌÀü1´ÙÀ½